Meerkerk
26/10/2026
Installations
Employment contract, Self-employed - ZZP
For the project – finishing of the visible CLT (wooden) walls, floors and ceilings we are looking for an experienced professional.
CLT (Cross-Laminated Timber) is a strong, prefabricated wood construction material made by gluing several layers of solid timber together, with each layer positioned perpendicular to the previous one.
This concerns prefab houses on the project: Droomweide New-Build Development (formerly Weide II), Meerkerk, Municipality of Vijfheerenlanden
Scope of Work
Cleaning, preparing and finishing the visible CLT walls:
Cleaning the panels (removing adhesive residues and dirt)
Preparing and filling/finishing joints and uneven areas
Sanding to a neat visual finish (grit 60 and 100)
Labour Requirement
1 person (skilled), approximately 60–80 hours in total, then if approved extension.
Location
Droomweide new-build development, Meerkerk.
Schedule
target start week 44
Equipment: To Be Agreed
Mobile scaffold tower
Router
Sandpaper, grit 60 and 100
Lunea will provide: 2 drywall/“giraffe” sanding machines and a mobile scaffold tower
For years, our long-standing client has been shaping the landscape of high-end custom furniture, merging contemporary global design trends with the timeless warmth of premium solid wood. Building on a reputation for uncompromising craftsmanship and detail, they are now pioneering a new frontier in the industry: bringing bespoke design and superior woodworking to the modern prefabricated timber home market at Lumea Trade.
Experience in solid wood processing, sanding, and finishing.
620-650 Eur weekly netto for 40hours contract based
or freelance, hourly rate ranging from 32-33 eur
Overtime hours during the week and during Saturdays – after proving your full trustworthiness and independence – upon agreement
Accommodation provided, single certified fully furnished rooms
Weekly contribution to Stipp – Dutch pension system, own account
Proper Dutch contract
Support for administration and logistics